Our Logo....isn't it great. Thank you to Matt Howard for the logo, we absolutely love it. Okay so we are moving so fast with the theater progression that all I can say is WOW!!!!!! So many changes have occured in a weeks time. I went inside the theater today and the large cinema riser concrete has been poured. The more I looked around the more I realized the whole thing has changed so much!!! Take a look at the pictures!
Here are the risers poured for the large theater:
Look at the front of the concessions area:
A lot of the site work is progressing, we are trying to finish the parking lot and prep for asphalt next week. Some of the sidewalks have been poured, and things are looking pretty good. I will be posting more pictures next friday...can't wait to see the progression!!!
Friday, August 21, 2009
Thursday, August 13, 2009
2 weeks of changes
So many things are changing in the theater, and the schedule is changing so rapidly we are trying to keep up. Here are a few changes that are occuring:
A week ago the risers and interior of the building....
Now the interior of the building...
Much of the framing is being done now, and the HVAC is being worked on. Soon enough we will have electrical, concrete, paving, and all sorts of trades in the building. I am thrilled with the way that the risers and the interior for the theaters are coming along--Dave you and the guys are doing a great job.
A week ago the risers and interior of the building....
Now the interior of the building...
Much of the framing is being done now, and the HVAC is being worked on. Soon enough we will have electrical, concrete, paving, and all sorts of trades in the building. I am thrilled with the way that the risers and the interior for the theaters are coming along--Dave you and the guys are doing a great job.
Monday, August 10, 2009
Construction
Construction really slowed down for the month of July. We now have walls up, foam risers under construction, and construction really seems to be speeding up significantly.
As for the opening date it has been pushed back to mid-September. Not great, but we are pushing as fast as we can. Dave is rushing things along, and we are working for a tight opening date...soon to be announced.
Quiznos is doing well, they are busy as usual and we hope that it stays that way. We do have a small announcement on that side of things, Melica Estes was named our Assistant Manager. WE absolutely love her. Congrats Melica!!!
As for the opening date it has been pushed back to mid-September. Not great, but we are pushing as fast as we can. Dave is rushing things along, and we are working for a tight opening date...soon to be announced.
Quiznos is doing well, they are busy as usual and we hope that it stays that way. We do have a small announcement on that side of things, Melica Estes was named our Assistant Manager. WE absolutely love her. Congrats Melica!!!
Thursday, July 2, 2009
QUIZNOS IS OPEN!!!
Wednesday, July 1, 2009
Quiznos is HERE!!!
BEFORE
AFTER
Yes after many and I mean MANY hours of labor, loving care, phone calls, faxes, interviews, and everything else it takes to get a business together it is finally here--QUIZNOS!!!!
We are so excited that we are finally going to open the doors, and start our new little sandwhich shop in Nephi!!!
I am hoping to have some pictures of our first crew, and show some of the inside before the doors open for business this week. Cross your fingers for us because we are trying to open JULY 2. Come visit us, have a sandwhich and get to know our friendly crew that is still training!!!
AFTER
Yes after many and I mean MANY hours of labor, loving care, phone calls, faxes, interviews, and everything else it takes to get a business together it is finally here--QUIZNOS!!!!
We are so excited that we are finally going to open the doors, and start our new little sandwhich shop in Nephi!!!
I am hoping to have some pictures of our first crew, and show some of the inside before the doors open for business this week. Cross your fingers for us because we are trying to open JULY 2. Come visit us, have a sandwhich and get to know our friendly crew that is still training!!!
Monday, June 1, 2009
6-1-09
I haven't posted for a long while....but with my computer being down it makes it really hard to download and post pictures. So pics will definitely be posted tonight.
The buildings are coming along very,very well. The retail space is all but done, the exterior is all but completed. The interior for the Quiznos is coming along--I still haven't seen the inside but I hear it is painted!!! I am going to try to get pictures this Thurs. of it. Materials for the opening will be here soon, and the coolers will be here before we know it. I am very excited.
As for the theater we are moving a little bit slower, the weather the last couple of days has put us behind....and lets be serious subcontractors don't like to work very hard after a long weekend (darn Memorial weekend). The roof is a quarter of the way on, electrical for it is being designed as we speak, and fire sprinklers should be coming along, drywall and acoustical ceiling next, and then the pouring of the floor. After that it will be rush, rush to get to where we need to be. I can hardly believe that in two weeks the building won't even look the same (if we can keep the subs moving.....please help us by crossing your fingers at this point).
Our project manager, Dave, is helping lots, and lots. He keeps us moving, and the subs in line. He is so on top of things that he is ahead of me most of the time by a few steps, can I say way impressed again. We are very glad we hired him.
The buildings are coming along very,very well. The retail space is all but done, the exterior is all but completed. The interior for the Quiznos is coming along--I still haven't seen the inside but I hear it is painted!!! I am going to try to get pictures this Thurs. of it. Materials for the opening will be here soon, and the coolers will be here before we know it. I am very excited.
As for the theater we are moving a little bit slower, the weather the last couple of days has put us behind....and lets be serious subcontractors don't like to work very hard after a long weekend (darn Memorial weekend). The roof is a quarter of the way on, electrical for it is being designed as we speak, and fire sprinklers should be coming along, drywall and acoustical ceiling next, and then the pouring of the floor. After that it will be rush, rush to get to where we need to be. I can hardly believe that in two weeks the building won't even look the same (if we can keep the subs moving.....please help us by crossing your fingers at this point).
Our project manager, Dave, is helping lots, and lots. He keeps us moving, and the subs in line. He is so on top of things that he is ahead of me most of the time by a few steps, can I say way impressed again. We are very glad we hired him.
Thursday, April 23, 2009